April 01, 1995
Arizona Water Resources
,
Joe Gelt ed.
4 vol.
,
no. 4
,
12 pp.
,
Water Resources Research Center
The City of Tucson has narrowed its options for using its Central Arizona Project water allocation to four: direct treatment and delivery through the existing treatment plant after replacing deteriorating mains; augmenting treatment with a filtration stage to remove salts; blending CAP water with equal amounts of groundwater; and recharging CAP water using spreading basins, streambeds, and/or injection wells.